MAKE A HUGE DIFFERENCE IN A SMALL MOVE
Subcategories
ESB 111M EPOXY SOLVENT BASED 2K
FPS 30 SERIES - TETRAFLOOR
TETRACO TPR FLOOR COATING
EPOXY 2K - ESB 111 / ESF 222 / ESF 222FG

EPOXY SOLVENT BASED 2K – ESB 111M

                                                                                                                        

Gloss metal paint that provides outstanding adhesion, toughness, durability and has a long life when exposed to aggressive environments, with excellent resistance to chemicals and polluted atmospheres.

TETRACO ESB-111M dries to an ultra-hard durable finish and is suitable for industrial environments where heavy activity is present, factories, workshops, food & beverages process units and industrial warehouses.

Gloss Level: full gloss

Properties

  • Excellent hydrophobicity
  • Excellent hiding power
  • Excellent levelling
  • Excellent durability
  • Excellent chemical resistance
  • Excellent abrasion resistance
  • Good dry and wet adhesion

Preparation of surface

Metal surface should be clean, dry and free from dust, dirt, grease and other contaminates. All surfaces to be coated should be dry.

Previously Painted surfaces - Apply two full coats. As with all coating applications, suitable pre-treatment of the surface is vital. Previously painted surfaces with excessive flaking and displaying signs of uncured coatings should have the old coating completely removed. Where the coating appears sound, it is always advisable to check for suitability by undertaking small-scale trials. If the old paint is satisfactory, manually or machine clean with strong detergent and abrade the surface in the normal way.

Heavily Contaminated surfaces – TETRACO SB EPOXY ESB-111M will not adhere satisfactorily to heavy deposits of grease, oil etc. It will be necessary to mechanically clean and abrade the surface to remove the excess contamination.

New Uncoated Surfaces - For optimum performance, three coats should be applied. The first coat (primer) should be thinned 20%-25% using Epoxy Thinner. This should be followed by two full coats thinned upon the thickness required. It is important to allow the coating to dry for 8 hours between coats.

Application

  • Dilute first coat/primer up to 25% Thinner          
  • Dilute second coat up to 15% Thinner and apply 8 hours after first coat/primer                                                           
  • Apply by brush, roller or spray
  • It is highly recommended to protect the painted surface for 8 days before being exposed to chemicals, pollutants and mechanical stress (in order to obtain extreme hardness)          

Recommendation

  1. After mixing the two packages let-down the mix for 10 minutes to accelerate the chemical reaction
  2. Mixed quantities should be coated within two hours
  3. Good ventilation is essential throughout. This will assist drying and curing. Heavy exposure should be avoided for at least 8 Days
  4. Surface can be over coated after 8 hours, and up to 10 days, after this period the inter-coat adhesion may be impaired. Once full cure is achieved, typically after a period of approx. 8 days, sanding will be required to achieve inter-coat adhesion.

CAUTION

  • Avoid contact with the skin and eyes
  • Wear suitable protective clothing, goggles, dust mask and gloves
  • Ensure good ventilation during application
  • Keep away from children’s reach

MSDS is available on request for the safe handling of this product.

FIRST AID

 

  • Eyes: In the event of accidental splashes, flush eyes with warm water immediately and obtain medical advice
  • Skin: Wash skin thoroughly with soap and water or approved Industrial cleaner. DO NOT USE solvent or thinners.
  • Inhalation: Remove to fresh air
  • Ingestion: In case of accidental ingestion DO NOT INDUCE VOMITING. Obtain immediate medical attention.

 

Technical data

Product

Interior exterior metal coating – glossy

Binder

Epoxy resin – 2K

Dilution

Epoxy Thinner

Color

Upon request

Specific gravity

1.5 (mixed resin – package A) – 0.98 (hardener – package B)

Solids

60% by volume

Consumption

Varies upon surface condition – approximately  16 m2/1US gallon at 200 µm thickness

Drying time

 

3 hours in normal conditions for touch dry (25℃)

8 hours to recoat

8 days for total cure

Flash point

28℃ for the mixed product

Mix life

Mixed product should be coated in maximum 2 hours

Putty
Water Based Primers
Emulsions
Exterior Coatings
Water Proofing
Floor Coatings
Solvent Based Paints
Tile Adhesive & Grout